Welcome to the Series of Box Technology Pre-operation Inspection.
For Cryptocurrency Mining, achieving the perfect mining conditions is essential. Luckily, there is an immersion cooling solution from Boxtechy: 40KW Immersion Cooling Box.
We have many customers who use our 40KW Immersion Cooling Box. It is an energy-saving, efficient and intelligent product. Keep your miners green as well. Our professional R&D team and service team work hard to provide you with the most professional design and operational assurance.
Thanks to our customer for choosing Boxtechy DT-40KW, to ensure its good operation after installation, in the following article, we are going to introduce you to the pre-operation inspection and precautions of the 40KW Immersion Cooling Box.
Step 1: Open the Rear Cover and Top Cover
After the equipment is in place, long transportation may loosen the pipelines, causing medium leakage. Now let’s check the pipelines and circuit.
Open the rear cover and top cover and remove the screw with a screwdriver.
Step 2: Check the Pipelines Connection
Next, let’s check and tighten the pipeline connection part if necessary.
Step 3: Check the Electrical Components
Then, check and tighten the electrical components if necessary.
Step 4: Do the Wiring
After checking, let’s do the wiring when we wire it up according to the corresponding line sequence for wiring. During the process, the vital thing must remember is that the screws must be tightened while wiring to avoid false connections or burning of electrical devices.
More pre-operation inspection of the 40KW Immersion Cooling Box will be continued in the next update.
If you have any questions about our 40KW Immersion Cooling Box, please email us at info@boxtechy.com.