The Pre-operation Inspection of 200KW Immersion Cooling Cabinet (Part 1)

As an experienced immersion cooling manufacturing company, we have established the Box Technology brand to provide high-quality immersion cooling systems at the most cost-effective prices to miners around the world.

 

We are committed to providing the highest quality, most energy-efficient products that allow our customers to get the most out of their cryptocurrency mining process.

 

With this in mind, through the continuous efforts of our R&D team, we have developed a 200KW immersion cooling cabinet.

 

In today’s article, we will take the 200KW immersion cooling cabinet  as an example and describe our pre-operation inspection in detail below.

Step 1: Install the Waterway

After the 200KW liquid cooling box is in place, the first step is to install the waterway.

What’s more, the bottom pipe of our boxtechy DT-200KW is for water in, and the above pipe of our boxtechy DT-200KW is for water out.

the bottom pipe of our boxtechy DT-200KW is for water in and above pipe of our boxtechy DT-200KW is for water out.



Step 2: Connected to Pipes by Flexible Hose

We use flexible hoses, connected to pipes, and connect the main line to the Cooling Tower.
Connected to Pipes by Flexible Hose
Step 3: Remove the Cover Plate of the PDU

Let us brief the 200kw start-up operation:
First, remove the cover plate of the PDU.
Remove the Cover Plate of the PDU
Step 4: Put into the Miners

Then, put the miners into the 200kw immersion cooling machine.
miners into the 200kw immersion cooling machine
Step 5: Plug in the power cord

Plug in the power cord and the network cable.
up to 2 centermeters over the oil scale
Step 6: Pour the fluid in

Then pour the fluid, up to 2 centimeters over the oil scale.

In part 1 we have primarily introduced the waterway installation, pipes’ connection, and so on. More pre-operation Inspections will be continued in the next update.

 

Please contact us if you have any questions about our products.






Share This Post
ABOUT BOXTECHY

20 years of experience in the production of large equipment. liquid cooling equipment is the greenest and most effective solution.

Recent Posts

Get In Touch

Fill in the form below and our team will be happy to assist you

Contact Information

904-976-0826 
name@support.com

Opening Hours

Monday – Friday 9am-5pm 
Weekend – Closed

Address

524 Railroad Street, Jacksonville, Florida

GET IN TOUCH WITH BOXTECHY

Contact Form Demo (#3)